Industrial Zone Lanara

The Lanara industrial zone covers an area of 14 ha, of which 11.8 ha or 84% are free plots for investors.

There are 21 plots in the zone in different sizes from 2,700 m² to 8,500 m², with the subdivision plan being flexible, ie. it is possible to reduce or increase a particular plot by merging multiple plots.

The zone is located close to the city center and near the existing commercial facilities (Borje and Destilacija) and all the necessary infrastructure has been done within it.

Basic data

  • Zone type: brownfield, industrial and commercial
  • Surface area (planned, phase 1): 14 ha
  • Ownership: 100% owned by Teslić Municipality
  • Initial price of land (subject to changes): 25 KM/m2
  • Fee for regulation of construction land: 102,90 KM/m2
  • Fee for rent (one-off): 9,45 KM/m2
  • Target activities: wood and furniture, light industry and other clean production activities, repair shops, technical and engineering services
  • Location: 2 km from town centre

Infrastructure

  • Roads (access roads and within the zone): Yes
  • Electrical energy: Yes, substation 10-20/0.4 kV, 100/250 kVA
  • Water: Yes, Ø200 mm, flow 100 l/s
  • Sewerage: Yes
  • Possibility to dispose of solid waste: Yes
  • Telephone/internet: Yes
  • Gas: No
  • Heating: No

Industrial Zone Borje


This industrial and business zone is located in the very center of the city and in that sense is very attractive.

There are 20 brick buildings with about 18,000 m2 of space.

Facilities and infrastructure are preserved and in good condition.

Basic data

  • Zone type: brownfield, industrial
  • Surface area: 5.6 ha (available surface area: 4 ha)
  • Surface area of available structures: 500-1000 m2
  • Ownership: 100% owned by Teslić Municipality
  • Initial price of land (subject to changes): 45 KM/m2
  • Initial price of structures: 140-296 KM/m2
  • Fee for regulation of construction land: 65.00 KM/m2;
  • Fee for rent: 26 KM/m2
  • Target activities: any clean production activity
  • Number of companies in the zone: 3 (total of approximately 100 employees)
  • Location: town centre

Infrastructure

  • Roads (access roads and within the zone): Yes
  • Electrical energy: Yes, 4 MW capacity of the substation
  • Water: Yes, Ø250 and Ø110mm, flow 120 l/s
  • Sewerage: Yes, sewage waste and storm sewer
  • Possibility to dispose of solid waste: Yes
  • Telephone/internet: Yes
  • Gas: No
  • Heating: No